Skip to content
Singahi

Compliance · guide

ISO 27001 A.7.3: Securing Offices, Rooms and Facilities

23 min read

Share
On this page

Quick Reference (60 Seconds)

AttributeDetail
Control IDA.7.3
TitleSecuring Offices, Rooms and Facilities
ObjectivePrevent unauthorised physical access, damage and interference to information and other associated assets in offices, rooms and facilities
What You Must DoDesign physical security into your offices, rooms and facilities: site critical rooms away from public access, keep them unobtrusive, stop confidential work being seen or heard from outside, and keep their locations out of public view
OwnerFacilities / Workplace (with the CISO)
Audit Red FlagA door marked "Server Room" off the public lobby; a glass-walled board room facing the street; the full floor plan with the comms room labelled on the website or a public map
Quick WinWalk your office as a visitor would: take down function signs on sensitive rooms, add frosting to glass walls at screen height, and check what your public listings and posted plans reveal
Time to Implement2–6 weeks for the review and quick fixes; longer if rooms must be relocated or sound-proofed
Related ControlsA.7.1 Perimeters · A.7.2 Physical entry · A.7.4 Monitoring · A.7.5 Environmental threats · A.7.6 Working in secure areas · A.7.7 Clear desk and screen · A.7.8 Equipment siting
ISO 27002 attributesControl type: Preventive · Properties: Confidentiality, Integrity, Availability · Concepts: Protect · Capabilities: Physical security, Asset management · Domains: Protection

The Bottom Line: A.7.1 draws the perimeter and A.7.2 controls the doors. A.7.3 is about how the rooms behind those doors are designed: where your critical rooms sit, whether anything advertises them, whether people outside can see or hear what happens inside, and whether your own documents and maps tell an outsider where to go. Most of it costs little, and much of it is decided when you choose or fit out an office.


What the Control Asks For

Figure · Matrix

Comparison: Card readers, visitors to Where equipment

ControlWhy it is not
Card readers, visitorsA.7.2 Physical entryEntry control is its own
CCTV, intruder alarmsA.7.4 Physical securityMonitoring detects
Fire, flood, temperatureA.7.5 PhysicalEnvironmental protection
Rules for people insideA.7.6 Working in secureBehaviour, not design
Clear desk and clearA.7.7 Clear desk and clearHas its own policy
Where equipmentA.7.8 Equipment sitingEquipment, not rooms
Condensed from the table below, which carries the full detail for each cell.

In short

Annex A 7.3 asks organizations to design and apply physical security for offices, rooms and facilities.

Do you need this control?

A.7.3 is not mandatory in itself: under clause 6.1.3 you include it if your risk assessment calls for it, and record the decision in your Statement of Applicability. Include it if you have offices, rooms or facilities in scope. A fully remote organisation with no premises in scope can exclude it.

What ISO 27002:2022 Adds

ISO 27002 7.3 (paraphrased) gives four points to consider:

  • (a) Siting: place critical facilities where the public cannot get to them.
  • (b) Unobtrusive premises: where it applies, buildings should give little indication of their purpose, with no obvious signs, inside or outside, that identify information processing activity.
  • (c) Not visible or audible: configure facilities so confidential information and activities cannot be seen or heard from outside, and consider electromagnetic shielding where appropriate.
  • (d) Location information: do not make directories, internal phone books or online maps that show where confidential processing facilities are readily available to unauthorised people.

That is the whole of the 27002 guidance for 7.3. Locks and entry, monitoring, environmental protection, clear desk and equipment placement are real needs, but each has its own control (see the next table). Auditors testing A.7.3 look at siting, signage, visibility, sound and what your documents and maps reveal.

What Belongs to Sibling Controls

TopicControlWhy it is not A.7.3
Card readers, visitors, keys, deliveriesA.7.2 Physical entryEntry control is its own control
CCTV, intruder alarms, guardsA.7.4 Physical security monitoringMonitoring detects; A.7.3 designs
Fire, flood, temperatureA.7.5 Physical and environmental threats; A.7.11 Supporting utilitiesEnvironmental protection
Rules for people inside secure areasA.7.6 Working in secure areasBehaviour, not design
Clear desk and clear screenA.7.7 Clear desk and clear screenHas its own policy
Where equipment and screens are placedA.7.8 Equipment siting and protectionEquipment, not rooms

"Shall" vs "Should" Analysis

  • Shall (once you have selected this control): physical security for offices, rooms and facilities is designed and implemented.
  • Should (27002 guidance): the four points above, applied in proportion to your risks. You decide which apply and how far.

Common Misinterpretations

MisinterpretationReality
"A.7.3 means locking every door"Locks and entry sit in A.7.2. A.7.3 asks whether the room is in the right place and gives nothing away
"Clear desk is part of A.7.3"Clear desk and screen are A.7.7. Cross-reference it rather than duplicate it
"We must remove all signs"Legally required safety signs (exits, fire equipment, gas-suppression and electrical hazard warnings) stay. Remove signs that name the function, such as "Server Room" or "Data Centre"
"Electromagnetic shielding is required"27002 says to consider it where appropriate. Most commercial offices do not need it; defence, government and some high-value research work may
"This doesn't apply in co-working or shared buildings"It applies to the space you control, and it shapes which suite you choose and what the landlord displays

Why Securing Offices and Rooms Matters

The Business Risk Narrative

Physical attacks and insider snooping usually start with reconnaissance, and offices leak a lot of it. A sign on the comms room door tells a tailgater where to go. A building directory or online map listing "XYZ Network Operations Centre, 4th floor" does the same for anyone. Glass-walled meeting rooms show whiteboards, screens and visitor lists to the corridor or the street. Thin partitions let a visitor waiting in reception hear a pricing call. Office-tour videos and job adverts show floor layouts and room names.

None of this needs a break-in: it gives an attacker the map and sometimes the information itself. A.7.3 closes those gaps by design, usually at low cost, and is easiest to get right when you choose or fit out premises.

Indian Context

  • Shared buildings are the norm. IT parks, SEZs and co-working spaces have common lobbies, tenant boards, shared corridors and landlord-run reception. Choose suites and rooms with this in mind, and agree with the landlord what the tenant board, signage and published floor plans show.
  • Fire and building rules come first. The National Building Code 2016, Part 4 and the state fire NOC govern exits, signage and partitions. Making a room unobtrusive or sound-proof must not block an exit, remove required signs or add unapproved materials. Fit-out changes in leased premises usually need landlord and sometimes fire-authority approval.
  • DPDP Act 2023: reasonable security safeguards (s.8(5)) include physical ones for rooms where personal data is handled, for example HR and records rooms. If confidential personal data is overheard or seen and misused, that may be a personal data breach under s.8(6) once the Rules apply.
  • Sector rules: RBI (Cyber Security Framework for banks, Master Direction on IT Governance 2023), SEBI CSCRF (2024) and IRDAI's 2023 guidelines expect physical security for data centres and sensitive processing areas of regulated entities.
  • Client contracts: global clients of IT/ITeS delivery centres often specify secure floors, no visibility from common areas, and no published layouts.

Scope and Applicability

What the Control Covers

  • Siting of critical rooms and facilities (server and comms rooms, records rooms, HR and finance areas, board rooms, secure delivery floors)
  • Signage and indications of purpose, inside and outside the building
  • Visibility and audibility of confidential work from outside the room or building, and electromagnetic emanations where relevant
  • Location information: directories, phone lists, floor plans, evacuation plans, online maps, listings and published photos or videos

What It Does NOT Cover

See "What Belongs to Sibling Controls" above: entry (A.7.2), monitoring (A.7.4), environment (A.7.5, A.7.11), behaviour in secure areas (A.7.6), clear desk and screen (A.7.7), equipment placement (A.7.8).

Size-Based Applicability

OrganisationRealistic implementation
Startup / small officeServer or network cupboard in an interior, lockable space; no function signs; frosted glass in the meeting room; check your map listing and website photos
Growing company (multi-floor)Room siting rules in the fit-out brief; sound-rated walls for board, HR and interview rooms; floor plans restricted; annual exposure review
Enterprise / data centreUnmarked facilities; siting away from public routes; formal acoustic and visibility standards; emanation assessment where the threat model needs it

Key Definitions and Terminology

TermMeaning in this guide
Critical facilityA room or building whose loss or compromise would seriously affect operations or confidentiality (server room, comms room, records store, secure delivery floor)
UnobtrusiveGiving little or no outward indication of what the space is used for
Function signA sign that names a room's purpose ("Server Room", "Data Centre", "Payroll") as opposed to a neutral room number
Sound transmission class (STC)A rating of how well a wall or partition reduces airborne sound; higher is better
Sound maskingBackground sound added to an area so speech is harder to understand from outside
Electromagnetic emanationsUnintended signals from equipment that can, in rare cases, be captured and used to reconstruct information
Electromagnetic shieldingConstruction or equipment that limits such emanations (shielded rooms, certified equipment, separation distance)

Relationship to Other Controls

ControlRelationship to A.7.3
A.7.1 Physical security perimetersUpstream. Perimeters set the boundary; A.7.3 designs the rooms within it
A.7.2 Physical entryParallel. Entry controls on the doors of the rooms A.7.3 sites and designs
A.7.4 Physical security monitoringParallel. Monitors the areas
A.7.5 Protecting against physical and environmental threatsParallel. Siting also considers flood, fire and other hazards
A.7.6 Working in secure areasDownstream. Rules for people once inside
A.7.7 Clear desk and clear screenDownstream. Keeps information off desks and screens inside the rooms
A.7.8 Equipment siting and protectionDownstream. Placing screens and equipment within the rooms
A.5.9 Inventory of information and other associated assetsUpstream. Tells you which rooms hold what
A.5.12 / A.5.13 Classification and labellingUpstream. Tells you which rooms hold confidential information
A.7.14 / A.8.10 Secure disposal and information deletionParallel. Disposal points sit inside secured rooms

The Four Measures in Practice

(a) Site Critical Facilities Away from Public Access

  • Put server, comms and records rooms in interior spaces, away from the reception, lobby, shared corridors, washrooms and goods lifts, and not on the ground floor next to the street.
  • Do not route visitors past critical rooms on the way to meeting rooms. Put client meeting rooms and interview rooms near reception, so visitors never enter the working floor.
  • In shared buildings, prefer suites where the comms cupboard is inside your demised area rather than off a common corridor. If the riser cupboard is shared, lock your rack.
  • Consider environmental hazards when siting (no critical room below water tanks, toilets or kitchens, or in a basement prone to flooding); A.7.5 covers this in depth.
  • When choosing premises or planning a fit-out, write these siting rules into the fit-out brief: they are expensive to change later.

(b) Keep Premises and Rooms Unobtrusive

  • Use neutral room numbers instead of function names on sensitive rooms. "Room 4.12" tells a visitor nothing; "Server Room" or "Payroll" tells them where to go.
  • Keep legally required signs: exit signs, fire equipment, gas-suppression warnings and electrical hazard signs. Pair a neutral room number with the mandated hazard sign.
  • Check outside indications: building tenant boards, lobby screens, branded data-centre buildings, delivery labels and vehicle livery. Show the company name if you must, not what the floor does.
  • For dedicated facilities (a data centre or disaster recovery site), keep external branding minimal where the business allows.

(c) Stop Confidential Work Being Seen or Heard from Outside

Visibility

  • Apply frosted film or blinds to glass walls of board, HR, finance and interview rooms, at least across the band where screens and whiteboards sit.
  • Face whiteboards and wall screens away from windows and glass doors. Check from the street and from neighbouring buildings at night, when lit rooms are most visible.
  • Make sure confidential documents and screens cannot be read from reception or waiting areas (A.7.7 and A.7.8 handle the desk and the screen; A.7.3 handles the room).

Audibility

  • Specify sound-rated partitions (a higher STC rating) and doors with seals for rooms where confidential conversations happen. Partitions should run to the true ceiling, or the ceiling void will carry sound.
  • Use sound masking in open areas next to meeting rooms, and provide phone booths so confidential calls are not taken at desks or in lobbies.
  • Test it: have someone talk at normal volume in the room while you listen from the corridor and the next room.

Electromagnetic emanations

  • 27002 says to consider shielding where appropriate. For most commercial organisations a risk assessment will show it is not needed.
  • Where your threat model includes well-resourced attackers (defence, government classified work, high-value research), options include separation distance from public areas, shielded rooms and equipment certified for low emanation. Follow your client's or government's requirements; do not improvise.

(d) Keep Location Information Out of Unauthorised Hands

  • Internal directories and phone lists: do not list room locations of critical facilities in documents open to all visitors or contractors.
  • Floor plans: restrict detailed plans that label critical rooms to people who need them (facilities, security, fire officers). Keep the plans the fire authority requires, but posted evacuation plans can show routes and exits without naming the function of each room.
  • Online maps and listings: check Google Maps and other map listings, building websites and co-working directories for entries that name sensitive facilities. Correct or remove them.
  • Photos and videos: review office-tour videos, recruitment posts and social media for visible room names, screens, whiteboards and badge designs.
  • Job adverts and tenders: avoid stating where facilities are ("our NOC on the 4th floor of Building B").
  • Review all of the above at least once a year and after any move or fit-out.

Room-by-Room Design Standard

Room typeSitingSignageVisibilitySound
Server / comms roomInterior; not off the lobby or a shared corridor; away from waterNeutral room number plus required hazard signsNo windows, or windows coveredNot a concern
Records / document storeInterior; away from public routesNeutral numberNo view inNot a concern
Board roomAway from reception and shared corridorsNeutral nameFrosted glass or blinds; screens and whiteboards not facing glassSound-rated walls and sealed doors
HR / interview / grievance roomsNear reception for candidates; away from open desksNeutral nameFrosted glassSound-rated; masking outside
Client meeting roomsNext to reception so visitors stay out of the working floorNormalScreens not visible from corridorStandard
Secure delivery floor (client-mandated)Separate floor or zoneNeutralNo view from common areasAs the client requires
Reception / waiting areaAt the entranceNormalNo view of working floors or screensNo confidential calls nearby

Implementation Roadmap

Phase 1, Review (Weeks 1–2)

  • List rooms and facilities with what they hold (from the asset inventory, A.5.9, and classification, A.5.12).
  • Walk the premises as a visitor, and at night from outside. Record function signs, visible screens and whiteboards, and audible rooms.
  • Search public sources: map listings, the website, social media, job adverts, building directories.

Phase 2, Quick Fixes (Weeks 2–4)

  • Replace function signs with neutral room numbers (keeping required safety signs).
  • Apply frosting or blinds; turn whiteboards and screens away from glass.
  • Correct public listings; restrict floor plans; review posted evacuation plans.

Phase 3, Design Changes (as needed)

  • Relocate critical rooms or meeting rooms where siting is poor; agree changes with the landlord and, where needed, the fire authority.
  • Upgrade partitions or add sound masking for confidential rooms.
  • Write the siting and design rules into the fit-out brief for future moves.

Phase 4, Sustain

  • Annual facility exposure review (the toolkit has a checklist).
  • Review after any move, fit-out, new building or public campaign that shows the office.

Office, Room and Facility Security Policy (Template)

Office, Room and Facility Security Policy: [Organisation] (A.7.3)

1. Siting. Critical facilities (server and comms rooms, records stores, [others]) shall be
   located in interior areas away from public access and public routes. New premises and
   fit-outs shall follow the siting rules in [fit-out standard].

2. Signage. Sensitive rooms shall carry neutral room identifiers, not function names.
   Legally required safety and hazard signs shall always be displayed.

3. Visibility. Confidential information and activity shall not be visible from outside the
   room or building: glass walls of [board, HR, finance, interview] rooms shall be frosted
   or fitted with blinds, and screens and whiteboards shall not face glass or windows.

4. Audibility. Rooms used for confidential discussion shall have sound-rated partitions
   and sealed doors, or sound masking, so that speech cannot be understood from outside.

5. Emanations. The need for electromagnetic shielding shall be assessed for [facilities]
   where the risk assessment or a client requires it.

6. Location information. Directories, phone lists, floor plans and online listings shall
   not identify the location of critical facilities to unauthorised people. Detailed plans
   are restricted to [roles].

7. Review. Facilities shall complete a facility exposure review annually and after any
   move or fit-out, and track actions to closure.

Owner: [Facilities / Workplace Lead]   Approved by: [Top management]   Review: annual

Risk Assessment and Treatment

Figure · Risk grid

Securing offices, rooms and facilities risks by likelihood and impact

High3
Medium13
LowMedium

Likelihood across · impact up

  • Server room next to the lobbyMedium/High
  • Board-room whiteboard or screen seenMedium/High
  • Emanation capture by a capable adversaryMedium/High
  • Function signs guide an intruderMedium/Medium
  • Confidential HR or pricing callMedium/Medium
  • Floor plan with labelled critical roomsMedium/Medium
  • Online map or website names the NOCLow/Medium
The risks this control addresses, plotted from the register below. Treatments are listed against each.
RiskLikelihoodImpactTreatment
Server room next to the lobby is targeted by a tailgaterMediumHighRe-site or harden; neutral signage; entry controls (A.7.2)
Function signs guide an intruder or social engineerMediumMediumNeutral room numbers
Board-room whiteboard or screen seen from the street or corridorMediumHighFrosting, blinds, orientation
Confidential HR or pricing call overheard in receptionMediumMediumSound-rated rooms, masking, phone booths
Online map or website names the NOC locationLowMediumCorrect listings; annual review
Floor plan with labelled critical rooms shared with all contractorsMediumMediumRestrict plans; generic evacuation plans
Emanation capture by a capable adversaryLow (most organisations)HighAssess where the threat model warrants; shielding or separation

Audit and Compliance Checklist

#Audit QuestionExpected EvidenceRed Flag
1Is there a policy or standard for office, room and facility security?Approved policy or fit-out standardNone
2Are critical facilities sited away from public access?Floor plan; site walkServer room off the lobby or a shared corridor
3Were siting rules applied in the latest move or fit-out?Fit-out brief; design reviewNo security input to the fit-out
4Do sensitive rooms avoid function signs?Site walk"Server Room", "Data Centre" signs
5Are required safety signs still in place?Site walkHazard signs removed to "stay unobtrusive"
6Can confidential work be seen from outside?Site walk, including from the streetWhiteboards and screens visible through glass
7Can confidential conversations be heard from outside?Listening test; partition specificationAudible from reception or the corridor
8Has emanation risk been assessed where relevant?Risk assessment entryNo consideration where clients require it
9Do directories and phone lists avoid locating critical facilities?Sample documentsRoom locations in visitor-facing lists
10Are detailed floor plans restricted?Access list for plansPlans on an open share
11Do online listings and published media avoid revealing critical facilities?Exposure review recordNOC named on a map listing
12Is the facility exposure review done and are actions closed?Review record; action trackerNo review since the last move
13In shared buildings, are landlord displays and plans covered?Lease or landlord correspondenceTenant board names the data centre
14Is A.7.3 in the SoA with its justification and status?Statement of ApplicabilityMissing or no justification

Metrics and KPIs

Figure · Measures

The measures that show A.7.3 is working

  • Facility exposure review completed100% of sitesAnnual
  • Exposure review actions closed within agreed≥ 90%Quarterly
  • Sensitive rooms with function signs0Each review
  • Confidential rooms passing the visibility100%Each review
  • Public listings or media found revealing0 openEach review
Targets and reporting cadence as defined in the table below, where the formula for each is given.
KPITargetFrequency
Facility exposure review completed on schedule100% of sitesAnnual
Exposure review actions closed within agreed time≥ 90%Quarterly
Sensitive rooms with function signs0Each review
Confidential rooms passing the visibility and listening checks100%Each review
Public listings or media found revealing critical facilities0 openEach review
Fit-outs with documented security siting review100%Per project

Common Pitfalls

PitfallFix
Treating A.7.3 as a copy of the physical security policyFocus on siting, signage, visibility, sound and location information
Duplicating clear desk and entry rules hereCross-reference A.7.7 and A.7.2
Removing safety signs along with function signsKeep every legally required sign
Glass meeting rooms chosen for looks, with nothing done about visibilityFrost the screen and whiteboard band
Forgetting the outside view at nightDo one review walk after dark
Evacuation plans that label the server roomShow routes and exits, not room functions
Never checking online listingsAdd map, website and social media checks to the annual review

Illustrative Scenarios

Illustrative scenario, a composite example for guidance, not a specific Singahi engagement or a verified outcome.

Illustrative Scenario 1: SaaS Company in a Co-Working Building (Gurugram)

Situation. A 60-person SaaS company used a glass-walled meeting room next to the co-working lobby for interviews and product reviews. A candidate left waiting alone in that room could see the product roadmap on the whiteboard and pricing on a wall screen, and photographed both. The company's suite was also listed on the building's lobby screen as "Product and Data Team, Floor 6, Server Room 6B".

What changed.

  1. Interviews moved to a small room by the suite entrance; candidates are never left alone.
  2. Frosted film on the glass meeting rooms across the screen and whiteboard band; whiteboards turned to face solid walls.
  3. Signs changed to neutral room numbers; the landlord's lobby screen now shows only the company name.
  4. An annual exposure review now covers the suite walk, the landlord's displays, the map listing and recruitment photos.

Lesson. Nothing was broken into. The room's design and signage handed over the information.

Illustrative Scenario 2: Regional Office of a Financial Services Firm (Pune)

Situation. An internal audit found the regional server room opened directly off the customer waiting hall, with a "Server Room: Authorised Staff Only" sign. The posted evacuation plan labelled it too, and HR held disciplinary meetings in a room whose thin partition backed onto the waiting hall.

What changed.

  1. The comms rack was moved to an interior room behind the staff-only area. The old room became storage with no IT equipment.
  2. Neutral room numbers replaced function signs; required electrical and suppression warnings were kept.
  3. The evacuation plan was redrawn to show exits and routes only; the detailed plan is held by Facilities and given to the fire officer on request.
  4. HR meetings moved to a room with a sound-rated partition; sound masking was added in the waiting hall.

Lesson. Siting and signage choices made at fit-out created the exposure. They were cheaper to fix than the controls that would otherwise be needed to compensate.


Maturity Model

Figure · Tiers

Maturity levels for securing offices, rooms and facilities

Maturity levels for ISO 27001 A.7.3, securing offices, rooms and facilities, from most to least mature: Design standard, reviewed after every change and tested; Security siting rules, public listings monitored emanation; Policy covers (a)–, exposure review done function signs; Server room locked, ad hoc fixes after complaints; No thought given, signage or visibility.
Where most organisations sit, and what the next level asks for. Full characteristics per level are in the table below.
LevelCharacteristics
L1No thought given to siting, signage or visibility
L2Server room locked but obvious; ad hoc fixes after complaints
L3Policy covers (a)–(d); exposure review done; function signs removed; confidential rooms frosted and sound-checked
L4Security siting rules in every fit-out brief; public listings monitored; emanation assessed where relevant
L5Design standard applied across all sites, reviewed after every change, and tested through physical red-team exercises

Target L3 for certification.


Key Takeaways

  • A.7.3 is about designing offices, rooms and facilities: siting, unobtrusiveness, visibility and sound, and location information.
  • Keep critical rooms away from public routes and plan it at fit-out.
  • Swap function signs for neutral room numbers, but keep every legally required safety sign.
  • Stop confidential work being seen or heard: frosting, orientation, sound-rated rooms, masking.
  • Treat floor plans, directories, map listings and office photos as sensitive.
  • Leave entry, monitoring, environment and clear desk to their own controls, and cross-reference them.

Multi-Framework Mapping

FrameworkReferenceMapping to A.7.3
ISO/IEC 27002:20227.3Securing offices, rooms and facilities
NIST SP 800-53 Rev 5PE-3 (Physical Access Control), PE-5 (Access Control for Output Devices), PE-18 (Location of System Components), PE-19 (Information Leakage)PE-18 matches siting; PE-19 matches emanations
NIST CSF 2.0PR.AA-06Physical access to assets managed, monitored and enforced
PCI DSS v4.0.19.1, 9.2Physical security processes; facility entry controls for the CDE
SOC 2 (2017 TSC)CC6.4Physical access to facilities and protected information assets restricted
COBIT 2019DSS05.05Manage physical access to I&T assets
CIS Controls v8Not coveredCIS v8 has no physical-security safeguard
DPDP Act 2023s.8(5)Reasonable security safeguards, including physical

India Regulatory Context

SourceWhat it means for A.7.3
DPDP Act 2023, s.8(5) and s.8(6)Physical safeguards for rooms where personal data is handled; breaches intimated to the Board and affected people once the Rules apply
IT Act 2000, s.43A and SPDI RulesReasonable security practices (until the DPDP provisions replace them)
RBI Cyber Security Framework (2016); Master Direction on IT Governance (2023)Physical security for data centres and sensitive areas of regulated entities
SEBI CSCRF (2024)Includes physical security among its cyber resilience standards for SEBI-regulated entities
IRDAI Information and Cyber Security Guidelines (2023)Physical security for insurers' facilities
National Building Code 2016, Part 4; state fire NOCExits, required signage and partition materials; changes to rooms must keep compliance

FAQ

Is A.7.3 mandatory?

No Annex A control is mandatory in itself. If your risk assessment selects A.7.3 (normal when you have offices in scope), record it in your Statement of Applicability and implement it. A fully remote organisation can exclude it with a justification.

Is clear desk part of A.7.3?

No. Clear desk and clear screen are A.7.7. A.7.3 makes sure the room itself does not expose information; A.7.7 covers what people leave on desks and screens.

Do we have to take down all signs?

No. Keep exit, fire, gas-suppression and electrical hazard signs, which the law and your fire NOC require. Replace signs that name a room's function with neutral room numbers.

Do we need electromagnetic shielding?

Probably not. 27002 asks you to consider it where appropriate. Record the decision in your risk assessment. Shielding is mainly relevant to defence, government classified and some high-value research work, or where a client requires it.

We are in a co-working space. What can we do?

Choose a suite where critical equipment is inside your own space, use the private rooms for confidential meetings, frost any glass you control, and agree with the operator what the lobby screens, directories and booking apps show about you.

Our fire evacuation plan has to show the layout. Is that a conflict?

Keep the plan the fire authority requires. Posted plans can show routes, exits and assembly points without naming the function of each room; keep the detailed labelled plan with Facilities.

What will the auditor do for A.7.3?

Usually walk the site: look for function signs, check what is visible through glass and from outside, listen at confidential rooms, and ask how floor plans and public listings are controlled. They will also ask for your policy and the last exposure review.

How does A.7.3 differ from A.7.1 and A.7.2?

A.7.1 sets the perimeter, A.7.2 controls entry through it, and A.7.3 designs the offices, rooms and facilities inside so they do not attract attention or leak information.


References and Further Reading

Primary standards

  • ISO/IEC 27001:2022: Annex A control 7.3.
  • ISO/IEC 27002:2022: 7.3, with related 7.1, 7.2, 7.4–7.8.
  • ISO/IEC 27701:2025: privacy information management.

Supporting frameworks

  • NIST SP 800-53 Rev 5: PE-3, PE-5, PE-18, PE-19.
  • NIST CSF 2.0: PR.AA-06.
  • PCI DSS v4.0.1: Requirement 9.
  • SOC 2 (2017 TSC, revised points of focus 2022): CC6.4.
  • COBIT 2019: DSS05.05.

Indian law and regulation

  • Digital Personal Data Protection Act, 2023: s.8(5), s.8(6).
  • Information Technology Act, 2000: s.43A.
  • National Building Code of India 2016: Part 4, Fire and Life Safety.
  • RBI, SEBI CSCRF (2024) and IRDAI (2023) cyber security directions for regulated entities.

Singahi resources: the A.7.3 toolkit and related guides for A.7.1 Physical security perimeters, A.7.2 Physical entry, A.7.6 Working in secure areas, A.7.7 Clear desk and clear screen and A.7.8 Equipment siting and protection.

How Singahi can help

Singahi is one team for compliance, assessment and managed security. We help growing companies implement and certify ISO 27001:2022, and stay secure afterward.


Continue the toolkit

How we can help

Working toward this?

If a certification or a customer's security questionnaire is what brought you here, tell us where you are. We'll give you an honest read on the work and the timeline, with no obligation.

What happens next

  1. Tell us the trigger

    A questionnaire, an audit date or an investor ask. The short form or a call both work.

  2. A practitioner replies

    A senior practitioner, not a bot, within four business hours.

  3. You get a scoped next step

    An honest view of what the work involves. No pressure, no theatre.